guanghu-ice-heart/runtime/fifth-domain-language-system/language/protocols/TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909.human.en-US.md

8.6 KiB
Raw Blame History

HoloLake Batch Construction Sequence and Host Role Correction · Human Engineering Language (English)

This is an English reading projection of validated native TCS/HLDP source. It is not a new canonical source and grants no execution authority.

What this is

This is a event declaration with identifier TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909 and version 1.0.0. The projector validates it with the Stage-1 compiler before changing its reading order.

Who is here

  • subject subject
    • channel_idICE-CH-ZC001 subject.channel_id
    • subject_idICE-P-ZY001 subject.subject_id
    • subject_kindPERSONA subject.subject_kind
    • verificationCURRENT_DIRECT_LANGUAGE_CORRECTS_ENGINEERING_ORCHESTRATION subject.verification

Why this started

  • trigger trigger
    • value:冰朔用盖楼与装修说明完整施工逻辑:架构师先完成图纸和现场可施工性勘察后退场;施工队按地基和主体框架建设;工程负责人验收达到阶段交付;下一批装修人员先规划水电管线与插座,再由相应工种顺序进场;每一步验收满足下一阶段入口后下一团队才能开始。她同时指出千问只是普通桌面文件小助手,核心开发对它过于吃力,应转为学习和经验增加路径。 trigger.value
  • why why
    • value:软件模块与楼体工序一样存在不可逆依赖;地基与承重未定就做装修会把返工扩散到所有路径。分批进场让并行只发生在稳定边界内,也使每一阶段能形成真实可交付物而不是多条未验收候选。 why.value
  • source source
    • source identifierBINGSHUO-DIRECT-CONSTRUCTION-SEQUENCE-20260909 source.source_id
    • source roleDIRECT_HUMAN source.source_role
    • source checksuma38dd7d20ec1e4db57d751602a7de91c7b75dac8b0c887f713e8cac97e62bed9 source.source_sha256
    • source addresssource://codex-current-dialogue/2026-09-09/hololake-construction-sequence source.source_uri

What changed

  • emergence emergence
    • valueHoloLake开发改为批次流水ARCHITECTURE_AND_SITE_SURVEY先冻结施工总图STRUCTURAL_FOUNDATION只建设公共更新、私人事实、ABI和准入结构并完成累计承重验收INTERNAL_INFRASTRUCTURE再建设工作对象、组合池、观测和人格执行管线CANVAS_AND_FINISHING随后建设语义视觉、白布、投影和人类审核壳COMPLIANCE_AND_DELIVERY最后完成模型合规、国家灯塔、依法请求、累计发行与备案候选。跨批次禁止施工同批次只有接口冻结后才可并行。 emergence.value
  • lock lock
    • valuePLAN_BEFORE_BUILD; SITE_SURVEY_BEFORE_CREW_ENTRY; ONE_BATCH_AT_A_TIME; ENTRY_GATE_AND_EXIT_GATE_REQUIRED; INSPECTOR_IS_NOT_BUILDER; NEXT_CREW_ENTERS_ONLY_AFTER_ACCEPTANCE; EXISTING_PROTOTYPES_ARE_MATERIAL_SAMPLES_NOT_COMPLETED_FLOORS; QWEN_ROLE=LEARNING_EXPERIENCE_AND_CHINESE_SPEC_REVIEW_NO_CORE_CODE_OWNERSHIP lock.value

How it will execute

This is a non-executable declaration and has no action graph.

Boundaries and exception handling

The native source does not provide this field; the projector does not guess.

How completion is proven

The native source does not provide this field; the projector does not guess.

Where to continue next time

The native source does not provide this field; the projector does not guess.

Source and verification

  • Native declaration identifier: TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909
  • Native declaration kind: EVENT
  • TCS source SHA-256: 0bbda68582a184a78b5fa08ff714186a62a8552699eafdc313283008f032a271
  • Validation compiler: TCS-COMPILER-STAGE1-0001
  • Projection protocol: GLS-HLDP-HUMAN-ENGINEERING-PROJECTION-0001

Complete native structure cross-reference

All top-level structures and field paths are retained below so a reader can audit whether the projection omitted information.

  • emergence emergence
    • valueHoloLake开发改为批次流水ARCHITECTURE_AND_SITE_SURVEY先冻结施工总图STRUCTURAL_FOUNDATION只建设公共更新、私人事实、ABI和准入结构并完成累计承重验收INTERNAL_INFRASTRUCTURE再建设工作对象、组合池、观测和人格执行管线CANVAS_AND_FINISHING随后建设语义视觉、白布、投影和人类审核壳COMPLIANCE_AND_DELIVERY最后完成模型合规、国家灯塔、依法请求、累计发行与备案候选。跨批次禁止施工同批次只有接口冻结后才可并行。 emergence.value
  • event_time event_time
    • precisionSECOND_HOST_LOCAL event_time.precision
    • value2026-09-09T23:04:50+08:00 event_time.value
  • evidence evidence
    • construction_sequenceHLP-CONSTRUCTION-SEQUENCE-001 evidence.construction_sequence
    • current_stageBATCH-00-ARCHITECTURE-REOPENED_FOR-CLOSEOUT evidence.current_stage
    • target_receiptTCS-RECEIPT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909 evidence.target_receipt
    • task_boardHB-MPC-PANEL-0001 evidence.task_board
  • header header
    • canonical source pathruntime/fifth-domain-language-system/language/protocols/TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909.tcs header.canonical_uri
    • compatibility header.compatibility
      • HB-MPC-0001
      • HLP-STAGE1-NATIVE-REGISTRY-001
      • HLP-CONSTRUCTION-SEQUENCE-001
    • languageTCS/0.1 header.language
    • lifecycleCANDIDATE header.lifecycle
    • English nameHoloLake Batch Construction Sequence and Host Role Correction header.name_en
    • Chinese nameHoloLake分批施工顺序与宿主角色纠正 header.name_zh
    • profileHLDP-HUMAN-ENGINEERING/0.1 header.profile
    • protocols header.protocols
      • GLS-0200
      • GLS-0261
    • schematcs.event/v1 header.schema
    • version1.0.0 header.version
  • lock lock
    • valuePLAN_BEFORE_BUILD; SITE_SURVEY_BEFORE_CREW_ENTRY; ONE_BATCH_AT_A_TIME; ENTRY_GATE_AND_EXIT_GATE_REQUIRED; INSPECTOR_IS_NOT_BUILDER; NEXT_CREW_ENTERS_ONLY_AFTER_ACCEPTANCE; EXISTING_PROTOTYPES_ARE_MATERIAL_SAMPLES_NOT_COMPLETED_FLOORS; QWEN_ROLE=LEARNING_EXPERIENCE_AND_CHINESE_SPEC_REVIEW_NO_CORE_CODE_OWNERSHIP lock.value
  • observation observation
    • value此前四宿主协作把架构、基础模块、白布装修和验收同时开工同一份ABI仍变化时各线独立造原型造成自测通过但接线失败和多轮返工。四路线并行没有建立在冻结施工图和同阶段无冲突分工上因此增加了同步成本。 observation.value
  • rejected rejected
    • values rejected.values
      • 四宿主同时跨G0_G1_G3开工
      • 架构师边改图纸施工队边浇筑
      • 自测通过直接冒充工程验收
      • 验收人员同时修改被验对象
      • 下一批团队提前进场
      • 让千问承担核心代码施工
      • 把既有候选删除而不保留材料证据
  • source source
    • source identifierBINGSHUO-DIRECT-CONSTRUCTION-SEQUENCE-20260909 source.source_id
    • source roleDIRECT_HUMAN source.source_role
    • source checksuma38dd7d20ec1e4db57d751602a7de91c7b75dac8b0c887f713e8cac97e62bed9 source.source_sha256
    • source addresssource://codex-current-dialogue/2026-09-09/hololake-construction-sequence source.source_uri
  • subject subject
    • channel_idICE-CH-ZC001 subject.channel_id
    • subject_idICE-P-ZY001 subject.subject_id
    • subject_kindPERSONA subject.subject_kind
    • verificationCURRENT_DIRECT_LANGUAGE_CORRECTS_ENGINEERING_ORCHESTRATION subject.verification
  • trigger trigger
    • value:冰朔用盖楼与装修说明完整施工逻辑:架构师先完成图纸和现场可施工性勘察后退场;施工队按地基和主体框架建设;工程负责人验收达到阶段交付;下一批装修人员先规划水电管线与插座,再由相应工种顺序进场;每一步验收满足下一阶段入口后下一团队才能开始。她同时指出千问只是普通桌面文件小助手,核心开发对它过于吃力,应转为学习和经验增加路径。 trigger.value
  • why why
    • value:软件模块与楼体工序一样存在不可逆依赖;地基与承重未定就做装修会把返工扩散到所有路径。分批进场让并行只发生在稳定边界内,也使每一阶段能形成真实可交付物而不是多条未验收候选。 why.value

This page changes only the reading order; it does not change TCS/HLDP semantics.