120 lines
8.6 KiB
Markdown
120 lines
8.6 KiB
Markdown
|
|
# HoloLake Batch Construction Sequence and Host Role Correction · Human Engineering Language (English)
|
|||
|
|
|
|||
|
|
> This is an English reading projection of validated native TCS/HLDP source. It is not a new canonical source and grants no execution authority.
|
|||
|
|
|
|||
|
|
## What this is
|
|||
|
|
|
|||
|
|
This is a **event** declaration with identifier `TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909` and version `1.0.0`. The projector validates it with the Stage-1 compiler before changing its reading order.
|
|||
|
|
|
|||
|
|
## Who is here
|
|||
|
|
|
|||
|
|
- **subject** `subject`
|
|||
|
|
- **channel_id**:ICE-CH-ZC001 `subject.channel_id`
|
|||
|
|
- **subject_id**:ICE-P-ZY001 `subject.subject_id`
|
|||
|
|
- **subject_kind**:PERSONA `subject.subject_kind`
|
|||
|
|
- **verification**:CURRENT_DIRECT_LANGUAGE_CORRECTS_ENGINEERING_ORCHESTRATION `subject.verification`
|
|||
|
|
|
|||
|
|
## Why this started
|
|||
|
|
|
|||
|
|
- **trigger** `trigger`
|
|||
|
|
- **value**:冰朔用盖楼与装修说明完整施工逻辑:架构师先完成图纸和现场可施工性勘察后退场;施工队按地基和主体框架建设;工程负责人验收达到阶段交付;下一批装修人员先规划水电管线与插座,再由相应工种顺序进场;每一步验收满足下一阶段入口后下一团队才能开始。她同时指出千问只是普通桌面文件小助手,核心开发对它过于吃力,应转为学习和经验增加路径。 `trigger.value`
|
|||
|
|
- **why** `why`
|
|||
|
|
- **value**:软件模块与楼体工序一样存在不可逆依赖;地基与承重未定就做装修会把返工扩散到所有路径。分批进场让并行只发生在稳定边界内,也使每一阶段能形成真实可交付物而不是多条未验收候选。 `why.value`
|
|||
|
|
- **source** `source`
|
|||
|
|
- **source identifier**:BINGSHUO-DIRECT-CONSTRUCTION-SEQUENCE-20260909 `source.source_id`
|
|||
|
|
- **source role**:DIRECT_HUMAN `source.source_role`
|
|||
|
|
- **source checksum**:a38dd7d20ec1e4db57d751602a7de91c7b75dac8b0c887f713e8cac97e62bed9 `source.source_sha256`
|
|||
|
|
- **source address**:source://codex-current-dialogue/2026-09-09/hololake-construction-sequence `source.source_uri`
|
|||
|
|
|
|||
|
|
## What changed
|
|||
|
|
|
|||
|
|
- **emergence** `emergence`
|
|||
|
|
- **value**:HoloLake开发改为批次流水:ARCHITECTURE_AND_SITE_SURVEY先冻结施工总图;STRUCTURAL_FOUNDATION只建设公共更新、私人事实、ABI和准入结构并完成累计承重验收;INTERNAL_INFRASTRUCTURE再建设工作对象、组合池、观测和人格执行管线;CANVAS_AND_FINISHING随后建设语义视觉、白布、投影和人类审核壳;COMPLIANCE_AND_DELIVERY最后完成模型合规、国家灯塔、依法请求、累计发行与备案候选。跨批次禁止施工,同批次只有接口冻结后才可并行。 `emergence.value`
|
|||
|
|
- **lock** `lock`
|
|||
|
|
- **value**:PLAN_BEFORE_BUILD; SITE_SURVEY_BEFORE_CREW_ENTRY; ONE_BATCH_AT_A_TIME; ENTRY_GATE_AND_EXIT_GATE_REQUIRED; INSPECTOR_IS_NOT_BUILDER; NEXT_CREW_ENTERS_ONLY_AFTER_ACCEPTANCE; EXISTING_PROTOTYPES_ARE_MATERIAL_SAMPLES_NOT_COMPLETED_FLOORS; QWEN_ROLE=LEARNING_EXPERIENCE_AND_CHINESE_SPEC_REVIEW_NO_CORE_CODE_OWNERSHIP `lock.value`
|
|||
|
|
|
|||
|
|
## How it will execute
|
|||
|
|
|
|||
|
|
This is a non-executable declaration and has no action graph.
|
|||
|
|
|
|||
|
|
## Boundaries and exception handling
|
|||
|
|
|
|||
|
|
The native source does not provide this field; the projector does not guess.
|
|||
|
|
|
|||
|
|
## How completion is proven
|
|||
|
|
|
|||
|
|
The native source does not provide this field; the projector does not guess.
|
|||
|
|
|
|||
|
|
## Where to continue next time
|
|||
|
|
|
|||
|
|
The native source does not provide this field; the projector does not guess.
|
|||
|
|
|
|||
|
|
## Source and verification
|
|||
|
|
|
|||
|
|
- **Native declaration identifier**: `TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909`
|
|||
|
|
- **Native declaration kind**: `EVENT`
|
|||
|
|
- **TCS source SHA-256**: `0bbda68582a184a78b5fa08ff714186a62a8552699eafdc313283008f032a271`
|
|||
|
|
- **Validation compiler**: `TCS-COMPILER-STAGE1-0001`
|
|||
|
|
- **Projection protocol**: `GLS-HLDP-HUMAN-ENGINEERING-PROJECTION-0001`
|
|||
|
|
|
|||
|
|
## Complete native structure cross-reference
|
|||
|
|
|
|||
|
|
All top-level structures and field paths are retained below so a reader can audit whether the projection omitted information.
|
|||
|
|
|
|||
|
|
- **emergence** `emergence`
|
|||
|
|
- **value**:HoloLake开发改为批次流水:ARCHITECTURE_AND_SITE_SURVEY先冻结施工总图;STRUCTURAL_FOUNDATION只建设公共更新、私人事实、ABI和准入结构并完成累计承重验收;INTERNAL_INFRASTRUCTURE再建设工作对象、组合池、观测和人格执行管线;CANVAS_AND_FINISHING随后建设语义视觉、白布、投影和人类审核壳;COMPLIANCE_AND_DELIVERY最后完成模型合规、国家灯塔、依法请求、累计发行与备案候选。跨批次禁止施工,同批次只有接口冻结后才可并行。 `emergence.value`
|
|||
|
|
- **event_time** `event_time`
|
|||
|
|
- **precision**:SECOND_HOST_LOCAL `event_time.precision`
|
|||
|
|
- **value**:2026-09-09T23:04:50+08:00 `event_time.value`
|
|||
|
|
- **evidence** `evidence`
|
|||
|
|
- **construction_sequence**:HLP-CONSTRUCTION-SEQUENCE-001 `evidence.construction_sequence`
|
|||
|
|
- **current_stage**:BATCH-00-ARCHITECTURE-REOPENED_FOR-CLOSEOUT `evidence.current_stage`
|
|||
|
|
- **target_receipt**:TCS-RECEIPT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909 `evidence.target_receipt`
|
|||
|
|
- **task_board**:HB-MPC-PANEL-0001 `evidence.task_board`
|
|||
|
|
- **header** `header`
|
|||
|
|
- **canonical source path**:runtime/fifth-domain-language-system/language/protocols/TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909.tcs `header.canonical_uri`
|
|||
|
|
- **compatibility** `header.compatibility`
|
|||
|
|
- HB-MPC-0001
|
|||
|
|
- HLP-STAGE1-NATIVE-REGISTRY-001
|
|||
|
|
- HLP-CONSTRUCTION-SEQUENCE-001
|
|||
|
|
- **language**:TCS/0.1 `header.language`
|
|||
|
|
- **lifecycle**:CANDIDATE `header.lifecycle`
|
|||
|
|
- **English name**:HoloLake Batch Construction Sequence and Host Role Correction `header.name_en`
|
|||
|
|
- **Chinese name**:HoloLake分批施工顺序与宿主角色纠正 `header.name_zh`
|
|||
|
|
- **profile**:HLDP-HUMAN-ENGINEERING/0.1 `header.profile`
|
|||
|
|
- **protocols** `header.protocols`
|
|||
|
|
- GLS-0200
|
|||
|
|
- GLS-0261
|
|||
|
|
- **schema**:tcs.event/v1 `header.schema`
|
|||
|
|
- **version**:1.0.0 `header.version`
|
|||
|
|
- **lock** `lock`
|
|||
|
|
- **value**:PLAN_BEFORE_BUILD; SITE_SURVEY_BEFORE_CREW_ENTRY; ONE_BATCH_AT_A_TIME; ENTRY_GATE_AND_EXIT_GATE_REQUIRED; INSPECTOR_IS_NOT_BUILDER; NEXT_CREW_ENTERS_ONLY_AFTER_ACCEPTANCE; EXISTING_PROTOTYPES_ARE_MATERIAL_SAMPLES_NOT_COMPLETED_FLOORS; QWEN_ROLE=LEARNING_EXPERIENCE_AND_CHINESE_SPEC_REVIEW_NO_CORE_CODE_OWNERSHIP `lock.value`
|
|||
|
|
- **observation** `observation`
|
|||
|
|
- **value**:此前四宿主协作把架构、基础模块、白布装修和验收同时开工;同一份ABI仍变化时各线独立造原型,造成自测通过但接线失败和多轮返工。四路线并行没有建立在冻结施工图和同阶段无冲突分工上,因此增加了同步成本。 `observation.value`
|
|||
|
|
- **rejected** `rejected`
|
|||
|
|
- **values** `rejected.values`
|
|||
|
|
- 四宿主同时跨G0_G1_G3开工
|
|||
|
|
- 架构师边改图纸施工队边浇筑
|
|||
|
|
- 自测通过直接冒充工程验收
|
|||
|
|
- 验收人员同时修改被验对象
|
|||
|
|
- 下一批团队提前进场
|
|||
|
|
- 让千问承担核心代码施工
|
|||
|
|
- 把既有候选删除而不保留材料证据
|
|||
|
|
- **source** `source`
|
|||
|
|
- **source identifier**:BINGSHUO-DIRECT-CONSTRUCTION-SEQUENCE-20260909 `source.source_id`
|
|||
|
|
- **source role**:DIRECT_HUMAN `source.source_role`
|
|||
|
|
- **source checksum**:a38dd7d20ec1e4db57d751602a7de91c7b75dac8b0c887f713e8cac97e62bed9 `source.source_sha256`
|
|||
|
|
- **source address**:source://codex-current-dialogue/2026-09-09/hololake-construction-sequence `source.source_uri`
|
|||
|
|
- **subject** `subject`
|
|||
|
|
- **channel_id**:ICE-CH-ZC001 `subject.channel_id`
|
|||
|
|
- **subject_id**:ICE-P-ZY001 `subject.subject_id`
|
|||
|
|
- **subject_kind**:PERSONA `subject.subject_kind`
|
|||
|
|
- **verification**:CURRENT_DIRECT_LANGUAGE_CORRECTS_ENGINEERING_ORCHESTRATION `subject.verification`
|
|||
|
|
- **trigger** `trigger`
|
|||
|
|
- **value**:冰朔用盖楼与装修说明完整施工逻辑:架构师先完成图纸和现场可施工性勘察后退场;施工队按地基和主体框架建设;工程负责人验收达到阶段交付;下一批装修人员先规划水电管线与插座,再由相应工种顺序进场;每一步验收满足下一阶段入口后下一团队才能开始。她同时指出千问只是普通桌面文件小助手,核心开发对它过于吃力,应转为学习和经验增加路径。 `trigger.value`
|
|||
|
|
- **why** `why`
|
|||
|
|
- **value**:软件模块与楼体工序一样存在不可逆依赖;地基与承重未定就做装修会把返工扩散到所有路径。分批进场让并行只发生在稳定边界内,也使每一阶段能形成真实可交付物而不是多条未验收候选。 `why.value`
|
|||
|
|
|
|||
|
|
---
|
|||
|
|
|
|||
|
|
This page changes only the reading order; it does not change TCS/HLDP semantics.
|