docs: record PNCC recovery quality evidence
GuangHu-Human-Responsibility: ICE-GL∞ / 冰朔 GuangHu-Persona-Cognitive-Author: ICE-P-ZY001 / 铸渊 GuangHu-Execution-Runtime: Codex thread 019febf6-3902-70f3-9d82-74c9680b0c7e GuangHu-Development-ID: DEV-20260810-014 GuangHu-Authorization-Scope: LOCAL_PNCC_RUNTIME_DEVELOPMENT_AND_PUBLICATION
This commit is contained in:
parent
5b042a65fe
commit
0ba2fabf8e
2 changed files with 7 additions and 5 deletions
|
|
@ -32,7 +32,7 @@ Windows / macOS / Linux 构建机与安装包
|
|||
|
||||
| 时间 | 版本 | 记录 | 状态 |
|
||||
| --- | --- | --- | --- |
|
||||
| 2026-08-11 | GH-PNCC 中断恢复 | [人格代码频道中断会话检查与安全恢复](operations/2026-08-11-hololake-pncc-interrupted-session-recovery.md) | 本地源码、完整 Rust/路由测试和 clippy 已完成;GHNQG、仓库发布、桌面集成与部署待验收 |
|
||||
| 2026-08-11 | GH-PNCC 中断恢复 | [人格代码频道中断会话检查与安全恢复](operations/2026-08-11-hololake-pncc-interrupted-session-recovery.md) | 实现提交已通过 GHNQG;仓库发布、桌面集成与部署待验收 |
|
||||
| 2026-08-11 | GH-PNCC 首个运行闭环 | [人格原生代码频道首个只读运行层回执](operations/2026-08-11-hololake-pncc-first-runtime-cycle.md) | 源码与测试闭环已完成;人类投影、桌面制品、发布、部署与在线健康仍未完成 |
|
||||
| 2026-08-08 | 0.2.0 | [光湖分域教育行业操作系统第一阶段](operations/2026-08-08-guanghu-education-subdomain-stage1.md) | 小新服务器身份、文档/表格回写、仪表盘投影、模块登记与回执链路已验证 |
|
||||
| 2026-08-07 | 1.0.0 | [人格记忆连续性工具包 HL-MOD-MCK-001](memory-continuity-kit/README.md) | 铸渊 Qoder CN 实例在线;其他实例拉取后需演习+真实核对才可宣称上线 |
|
||||
|
|
|
|||
|
|
@ -4,7 +4,7 @@
|
|||
- Persona cognitive author: `ICE-P-ZY001 / 铸渊`
|
||||
- Human responsibility subject: `ICE-GL∞ / 冰朔`
|
||||
- Source component: `product-source/hololake-platform/src-tauri/src/persona_code_channel.rs`
|
||||
- State: `LOCAL_SOURCE_IMPLEMENTED_AND_FULL_RUST_ROUTING_TESTED`
|
||||
- State: `SOURCE_COMMITTED_AND_GHNQG_PASS_PUBLICATION_PENDING`
|
||||
|
||||
## Implemented facts
|
||||
|
||||
|
|
@ -32,14 +32,16 @@ mismatches and attribution mismatches fail closed without resetting files or rel
|
|||
- Rust full suite: `1150 passed, 0 failed, 2 ignored`; integration test `1 passed`.
|
||||
- Rust clippy for all targets: `PASS` with `-D warnings`.
|
||||
- HoloLake architecture routing: `29 passed, 0 failed`.
|
||||
- GHNQG: `PASS_100` for implementation commit `5b042a65feef1459c066ecd8fb0874219dd86e80`;
|
||||
tree `b159bb716113abb17e0d0a9b30c4d8c324b24d1c`.
|
||||
- Tests cover safe abort, safe committed-session finalization, dirty-repository refusal, second-primary
|
||||
exclusion, path containment, model/evidence scope, checkpoint promotion and persona Git attribution.
|
||||
|
||||
## Remaining acceptance
|
||||
|
||||
- native authority/core and GHNQG pre-push quality gates;
|
||||
- repository commit, publication and fresh-clone readback;
|
||||
- repository publication and fresh-clone readback;
|
||||
- general-purpose organ contract beyond the first read-only fact organ;
|
||||
- HoloLake human projection, desktop artifact, installation, deployment and online health.
|
||||
|
||||
This receipt proves local source behavior only until the remaining quality and publication gates complete.
|
||||
This receipt proves the committed source and quality gates. Repository publication, desktop integration and
|
||||
runtime health remain separate until their own readback evidence exists.
|
||||
|
|
|
|||
Loading…
Reference in a new issue