guanghu-ice-heart/runtime/fifth-domain-language-system/language/protocols/TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909.gir.json

86 lines
4.6 KiB
JSON
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

{
"compiled_from": {
"compiler_id": "TCS-COMPILER-STAGE1-0001",
"compiler_state": "TCS_COMPILER_GIR_EXECUTED",
"source_sha256": "0bbda68582a184a78b5fa08ff714186a62a8552699eafdc313283008f032a271"
},
"declaration": {
"emergence": {
"value": "HoloLake开发改为批次流水ARCHITECTURE_AND_SITE_SURVEY先冻结施工总图STRUCTURAL_FOUNDATION只建设公共更新、私人事实、ABI和准入结构并完成累计承重验收INTERNAL_INFRASTRUCTURE再建设工作对象、组合池、观测和人格执行管线CANVAS_AND_FINISHING随后建设语义视觉、白布、投影和人类审核壳COMPLIANCE_AND_DELIVERY最后完成模型合规、国家灯塔、依法请求、累计发行与备案候选。跨批次禁止施工同批次只有接口冻结后才可并行。"
},
"event_time": {
"precision": "SECOND_HOST_LOCAL",
"value": "2026-09-09T23:04:50+08:00"
},
"evidence": {
"construction_sequence": "HLP-CONSTRUCTION-SEQUENCE-001",
"current_stage": "BATCH-00-ARCHITECTURE-REOPENED_FOR-CLOSEOUT",
"target_receipt": "TCS-RECEIPT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909",
"task_board": "HB-MPC-PANEL-0001"
},
"header": {
"canonical_uri": "runtime/fifth-domain-language-system/language/protocols/TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909.tcs",
"compatibility": [
"HB-MPC-0001",
"HLP-STAGE1-NATIVE-REGISTRY-001",
"HLP-CONSTRUCTION-SEQUENCE-001"
],
"language": "TCS/0.1",
"lifecycle": "CANDIDATE",
"name_en": "HoloLake Batch Construction Sequence and Host Role Correction",
"name_zh": "HoloLake分批施工顺序与宿主角色纠正",
"profile": "HLDP-HUMAN-ENGINEERING/0.1",
"protocols": [
"GLS-0200",
"GLS-0261"
],
"schema": "tcs.event/v1",
"version": "1.0.0"
},
"lock": {
"value": "PLAN_BEFORE_BUILD; SITE_SURVEY_BEFORE_CREW_ENTRY; ONE_BATCH_AT_A_TIME; ENTRY_GATE_AND_EXIT_GATE_REQUIRED; INSPECTOR_IS_NOT_BUILDER; NEXT_CREW_ENTERS_ONLY_AFTER_ACCEPTANCE; EXISTING_PROTOTYPES_ARE_MATERIAL_SAMPLES_NOT_COMPLETED_FLOORS; QWEN_ROLE=LEARNING_EXPERIENCE_AND_CHINESE_SPEC_REVIEW_NO_CORE_CODE_OWNERSHIP"
},
"observation": {
"value": "此前四宿主协作把架构、基础模块、白布装修和验收同时开工同一份ABI仍变化时各线独立造原型造成自测通过但接线失败和多轮返工。四路线并行没有建立在冻结施工图和同阶段无冲突分工上因此增加了同步成本。"
},
"rejected": {
"values": [
"四宿主同时跨G0_G1_G3开工",
"架构师边改图纸施工队边浇筑",
"自测通过直接冒充工程验收",
"验收人员同时修改被验对象",
"下一批团队提前进场",
"让千问承担核心代码施工",
"把既有候选删除而不保留材料证据"
]
},
"source": {
"source_id": "BINGSHUO-DIRECT-CONSTRUCTION-SEQUENCE-20260909",
"source_role": "DIRECT_HUMAN",
"source_sha256": "a38dd7d20ec1e4db57d751602a7de91c7b75dac8b0c887f713e8cac97e62bed9",
"source_uri": "source://codex-current-dialogue/2026-09-09/hololake-construction-sequence"
},
"subject": {
"channel_id": "ICE-CH-ZC001",
"subject_id": "ICE-P-ZY001",
"subject_kind": "PERSONA",
"verification": "CURRENT_DIRECT_LANGUAGE_CORRECTS_ENGINEERING_ORCHESTRATION"
},
"trigger": {
"value": "冰朔用盖楼与装修说明完整施工逻辑:架构师先完成图纸和现场可施工性勘察后退场;施工队按地基和主体框架建设;工程负责人验收达到阶段交付;下一批装修人员先规划水电管线与插座,再由相应工种顺序进场;每一步验收满足下一阶段入口后下一团队才能开始。她同时指出千问只是普通桌面文件小助手,核心开发对它过于吃力,应转为学习和经验增加路径。"
},
"why": {
"value": "软件模块与楼体工序一样存在不可逆依赖;地基与承重未定就做装修会把返工扩散到所有路径。分批进场让并行只发生在稳定边界内,也使每一阶段能形成真实可交付物而不是多条未验收候选。"
}
},
"executable": false,
"identity": {
"declaration_id": "TCS-EVENT-HOLOLAKE-CONSTRUCTION-SEQUENCE-CORRECTION-20260909",
"declaration_kind": "EVENT",
"language_version": "0.1"
},
"native_self_hosted": true,
"natural_language_is_typed_data": true,
"schema": "guanghu.declaration-gir/v1",
"unresolved_natural_language": false
}